What the filing says
A public-record reading of the proposed work.
Interior renovation and combination of two existing apartments into one. Exterior modifications proposed at roof. No change to use, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story office building built in 1904, with 14 homes, on a 8,787 sq ft lot.
- Built
- 1904
- Last altered
- 1989
- Floors
- 12
- Residential units
- 14
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-5/R9X
- Lot area
- 8,787 sq ft
- Building area
- 114,488 sq ft
- Historic district
- SoHo-Cast Iron Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 95 notices on file; the most recent was issued Jul 29, 2022.
- Construction
Issued Jul 29, 2022 — EMRGENCY WORK-@SUBCELLAR THE NORTH WALL BRICK IS BULGING &THERE IS POTENTIAL OF BRICK DETACHING & FALLING POSING A RISK IMMED REMOVE NON LOAD BEARING BRCK WALL UNDR PE DIRCT & CONT SUPRV SHORE &BRACE AS RQUIRD.FILE PRMT W/I 48HRS OF WRK STRT
- Construction
Issued Jul 29, 2022 — FAIL TO MAINTAIN-@SUBCELLAR THE NORTH WALL IS BULGING ANDCRACKING.WALL IS BULGING APPROX 6" OWNR ENGAGE NYSPE-SETUP MONITORNG PROGRM,INVSTGATE & PROVIDE SIGND & SEALED RPRT BY 8/5/22 TO XCELO@BUILDINGS.NYC.GOV
- Sprinkler
Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
3 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01183221-I1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01183221-I1
- BBL
- 1004980007
- Postal code
- 10012 · 227 filings
- Review type
- Standard Plan Examination
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 29
- Proposed dwelling units
- 29