NYC DOB record · S00811864-Z3

565 Westwood Avenue

565 Westwood Avenue, Staten Island, NY 10314

New building filing in Todt Hill-Emerson Hill-Lighthouse Hill-Manor Heights, Staten Island. The latest DOB status is filing withdrawn.

The applicant withdrew this filing, so it is not going forward. What every status means

Closed or withdrawnNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S00811864-Z3

565 Westwood Avenue

Staten Island, NY 10314

New building · status dated Sep 11, 2026

Current record
Closed or withdrawn
Proposed scale
2 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S00811864-Z3 as a new building at 565 Westwood Avenue, Staten Island, NY 10314. Its latest published status category is Closed or withdrawn, dated Sep 11, 2026. The filing records 2 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Closed or withdrawn
Latest status date
Sep 11, 2026
Proposed scale
2 proposed stories
The building, not the filingopen housing violations, the owner of record and every filing at BIN 5175959Applicant of recordSee the 79 filings that name Mehandes Engineering
FiledNot recorded
Current recordClosed or withdrawn
Proposed scale2 stories
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

New Boiler application in conjunction with NB #S00811864-I1

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story office building built in 2024, on a 8,314 sq ft lot.

Built
2024
Floors
2
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
R3X
Lot area
8,314 sq ft
Building area
10,668 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Current status updated

    The latest recorded filing status is “Filing Withdrawn.”

    01

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S00811864-Z3
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
2
Existing dwelling units
Empty in the source
Proposed dwelling units
0