NYC DOB record · M01238815-I1

567 3 Avenue

567 3 Avenue, Manhattan, NY 10016

Alteration filing in Murray Hill-Kips Bay, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01238815-I1

567 3 Avenue

Manhattan, NY 10016

Alteration filing · status dated Sep 8, 2026

Current record
Approved
Proposed scale
50 stories
Dwelling units
200
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01238815-I1 as a alteration filing at 567 3 Avenue, Manhattan, NY 10016. Its latest published status category is Approved, dated Sep 8, 2026. The filing records 50 proposed stories and 200 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 8, 2026
Proposed scale
50 proposed stories and 200 proposed dwelling units
Applicant of recordSee the 105 filings that name Ancora Engineering, PLLC
FiledSep 8, 2026
Current recordApproved
Proposed scale50 stories
Recorded cost$20,001

What the filing says

A public-record reading of the proposed work.

Temporary bracing for the structure to remain at 569 3rd avenue by temporarily tying into the new building structure. new building filed separately under job #m00749928.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a vacant land on a 2,590 sq ft lot.

Last altered
1988
Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
C1-9
Lot area
2,590 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 16 open notices on record for this building, out of 53 notices on file; the most recent was issued Sep 28, 2006.

  • Construction

    Issued Sep 28, 2006

  • Zoning

    Issued Sep 28, 2006

  • Construction

    Issued Dec 1, 2003

  • 13 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01238815-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01238815-I1
BIN
1020334
BBL
1009180004
Review type
Professional Certification
Existing stories
50
Proposed stories
50
Existing dwelling units
200
Proposed dwelling units
200
Structural work