What the filing says
A public-record reading of the proposed work.
Installation of two post fire smoke purge system on roof and ductwork on mezzanine level.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 19-story condominium built in 1961, on a 32,273 sq ft lot.
- Built
- 1961
- Last altered
- 2022
- Floors
- 19
- Residential units
- 0
- Building type
- Condominium
- Land use
- Commercial and office
- Zoning district
- C6-4.5
- Lot area
- 32,273 sq ft
- Building area
- 307,939 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 187 notices on file; the most recent was issued Jan 11, 2024.
- Construction
Issued Jan 11, 2024 — EMERGENCY WORK ORDER ACTIVE PARKING STUCTURE OF 5 LEVEL BELOW 23FL BUILDING.SPALLING CONCRETE/EXPOSED REBAR VISIBLE CORROSION&RUSTING OF REINFORCEMENT ALL LEVEL-1 SUB-CELLAR CELLING@SEVERAL LOC.CAUSING IMMED HAZ TO TRAFFIC.REMEDY:RETAIN RDP TO DIR.&SUPERV.IMMED.INSTALL.SAFETY MEASURES SUCH AS STABLIZING CONCRETE MEMBERS.PROV.SHORING&BARRACADES
- Elevator
Issued Nov 20, 2008
- Elevator
Issued Jun 24, 2004
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01453112-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01453112-I1
- BIN
- 1036458
- BBL
- 1013057501
- Postal code
- 10022 · 1021 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 307
- Proposed dwelling units
- 307