NYC DOB record · Q00884033-I1

57-64 GAR 75 Street

57-64 GAR 75 Street, Queens, NY 11379

New building filing in Middle Village, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00884033-I1

57-64 GAR 75 Street

Queens, NY 11379

New building · status dated Oct 23, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00884033-I1 as a new building at 57-64 GAR 75 Street, Queens, NY 11379. Its latest published status category is Approved, dated Oct 23, 2026. The filing records 1 proposed story and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 23, 2026
Proposed scale
1 proposed story and 2 proposed dwelling units
Applicant of recordSee the 40 filings that name celtic way consulting llc
FiledJun 1, 2023
Current recordApproved
Proposed scale1 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Propose a new car garage at rear yard. obtain new c of o.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story two-family home built in 2024, on a 2,250 sq ft lot.

Built
2024
Last altered
2024
Floors
3
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R4-1
Lot area
2,250 sq ft
Building area
2,315 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00884033-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,253 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00884033-I1
BIN
4621088
BBL
4028130080
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
1
Existing dwelling units
Empty in the source
Proposed dwelling units
2
General constructionFoundation workEarthwork