What the filing says
A public-record reading of the proposed work.
Remove existing air-cooled split-system unit and associated duct, grilles, controls. provide new vrf split-system heat pump to serve cooling and supplemental heating loads. provide associated ductwork, supply and return grilles, controls, etc.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1893, with 6 homes, on a 2,254 sq ft lot.
- Built
- 1893
- Last altered
- 2008
- Floors
- 6
- Residential units
- 6
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C6-2A
- Lot area
- 2,254 sq ft
- Building area
- 12,300 sq ft
- Historic district
- Tribeca North Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 65 notices on file; the most recent was issued Feb 27, 2009.
- Local law 10/81 -
Issued Feb 27, 2009
- Local law 10/81 -
Issued Feb 19, 2002
- Elevator
Issued Oct 25, 1990 — 74 PROVIDE ACCESS TO OVERHEAD
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 8, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01306692-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01306692-P1
- BBL
- 1002150015
- Postal code
- 10013 · 704 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 6
- Proposed dwelling units
- 6








