NYC DOB record · M01101905-I1

57 West 38 Street

57 West 38 Street, Manhattan, NY 10018

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01101905-I1

57 West 38 Street

Manhattan, NY 10018

Alteration filing · status dated Sep 24, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01101905-I1 as a alteration filing at 57 West 38 Street, Manhattan, NY 10018. Its latest published status category is Approved, dated Sep 24, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 24, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 75 filings that name Ejc Engineering, PLLC
FiledSep 27, 2024
Current recordApproved
Proposed scaleNot specified
Recorded cost$41,040

What the filing says

A public-record reading of the proposed work.

Application filed to replace sprinkler heads as shown on plans.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story condominium built in 1915, on a 5,300 sq ft lot.

Built
1915
Floors
12
Residential units
0
Building type
Condominium
Land use
Commercial and office
Zoning district
M1-9A/R12
Lot area
5,300 sq ft
Building area
53,775 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01101905-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01101905-I1
BIN
1016020
BBL
1008407501
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0