NYC DOB record · M01357003-S1

570 Park Avenue

570 Park Avenue, Manhattan, NY 10065

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01357003-S1

570 Park Avenue

Manhattan, NY 10065

Alteration filing · status dated Oct 31, 2026

Current record
Approved
Proposed scale
16 stories
Dwelling units
52
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01357003-S1 as a alteration filing at 570 Park Avenue, Manhattan, NY 10065. Its latest published status category is Approved, dated Oct 31, 2026. The filing records 16 proposed stories and 52 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 31, 2026
Proposed scale
16 proposed stories and 52 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1040900Applicant of recordSee the 3 filings that name Arct Architecture PC
FiledMar 19, 2026
Current recordApproved
Proposed scale16 stories
Recorded cost$68,300

What the filing says

A public-record reading of the proposed work.

PLUMBING MODIFICATIONS (9th floor Residence APT 9B) AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 13-story elevator apartment building built in 1916, with 52 homes, on a 12,928 sq ft lot.

Built
1916
Last altered
1987
Floors
13
Residential units
52
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
12,928 sq ft
Building area
141,978 sq ft
Historic district
Upper East Side Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 33 open notices on record for this building, out of 81 notices on file; the most recent was issued Jul 6, 2021.

  • Failure to correct swarmp conditions (facade)

    Issued Jul 6, 2021 — CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • 30 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01357003-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01357003-S1
BBL
1013770040
Review type
Standard Plan Examination
Existing stories
16
Proposed stories
16
Existing dwelling units
52
Proposed dwelling units
52