NYC DOB record · M01303728-S1

575 5 Avenue

575 5 Avenue, Manhattan, NY 10017

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is prof cert qa review.

The filing was professionally certified by its architect or engineer, and DOB is auditing it rather than reviewing it in full. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 27, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01303728-S1

575 5 Avenue

Manhattan, NY 10017

Alteration filing · status dated Oct 23, 2026

Current record
Under review
Proposed scale
35 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01303728-S1 as a alteration filing at 575 5 Avenue, Manhattan, NY 10017. Its latest published status category is Under review, dated Oct 23, 2026. The filing records 35 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Oct 23, 2026
Proposed scale
35 proposed stories
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1035407Applicant of recordSee the 4 filings that name Shenberger & Associates Inc.
FiledOct 22, 2026
Current recordUnder review
Proposed scale35 stories
Recorded cost$130,000

What the filing says

A public-record reading of the proposed work.

Install Light Gauge Steel Framing to Frame & Support Partial Height Partitions, Suspended Ceiling & Ceiling Soffits on Part of Cellar&1st Floor & Structural Steel & Concrete to Frame & Support New Access Stair, Guardrails & Connections to Existing Steel

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 35-story condominium built in 1962, on a 20,084 sq ft lot.

Built
1962
Last altered
1982
Floors
35
Residential units
0
Building type
Condominium
Land use
Commercial and office
Zoning district
C5-3
Lot area
20,084 sq ft
Building area
411,780 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 227 notices on file; the most recent was issued Oct 30, 2014.

  • Elevator

    Issued Oct 30, 2014

  • Elevator

    Issued Feb 6, 2007

  • Elevator

    Issued Jan 20, 2006

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01303728-S1.

    01
  2. Current status updated

    The latest recorded filing status is “Prof Cert QA Review.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,269 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01303728-S1
BBL
1012827501
Review type
Professional Certification
Existing stories
35
Proposed stories
35
Existing dwelling units
0
Proposed dwelling units
0
Structural work