NYC DOB record · M00867128-I1

575 Lexington Avenue

575 Lexington Avenue, Manhattan, NY 10022

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00867128-I1

575 Lexington Avenue

Manhattan, NY 10022

Alteration filing · status dated Aug 31, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00867128-I1 as a alteration filing at 575 Lexington Avenue, Manhattan, NY 10022. Its latest published status category is Approved, dated Aug 31, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 31, 2026
Proposed scale
1 proposed story
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1036461Applicant of recordSee the 58 filings that name Gilsanz Murray Steficek LLP
FiledApr 15, 2024
Current recordApproved
Proposed scale1 stories
Recorded cost$799,950

What the filing says

A public-record reading of the proposed work.

WCM Lobby, Cellar; Structural work to accommodate the Primary Care Renovation in the existing building.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 199 notices on file; the most recent was issued Sep 3, 2019.

  • Sprinkler

    Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019

  • Elevator

    Issued Mar 4, 2014

  • Elevator

    Issued Jan 23, 2002 — 1F4157

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00867128-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 67,630 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00867128-I1
BBL
1013060023
Review type
Standard Plan Examination
Existing stories
1
Proposed stories
1
Existing dwelling units
0
Proposed dwelling units
0
Structural work