NYC DOB record · Q01455754-I1

58-12 Queens Boulevard

58-12 Queens Boulevard, Queens, NY 11377

Alteration filing in Woodside, Queens. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 30, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01455754-I1

58-12 Queens Boulevard

Queens, NY 11377

Alteration filing · status dated Sep 28, 2026

Current record
Approved
Proposed scale
9 stories
Dwelling units
122
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01455754-I1 as a alteration filing at 58-12 Queens Boulevard, Queens, NY 11377. Its latest published status category is Approved, dated Sep 28, 2026. The filing records 9 proposed stories and 122 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 28, 2026
Proposed scale
9 proposed stories and 122 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 4454475Applicant of recordSee the 1 filings that name Ignarri Lummis Architects
FiledSep 25, 2026
Current recordApproved
Proposed scale9 stories
Recorded cost$447,456

What the filing says

A public-record reading of the proposed work.

General Construction plans filed herewith to show interior renovation and exterior paint job for AutoZone. No change to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story condominium built in 1998, with 122 homes, on a 59,400 sq ft lot.

Built
1998
Floors
8
Residential units
122
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R8
Lot area
59,400 sq ft
Building area
157,430 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 59 notices on file; the most recent was issued Sep 30, 1998.

  • Construction

    Issued Sep 30, 1998

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 30, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01455754-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,082 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01455754-I1
BBL
4023137501
Review type
Professional Certification
Existing stories
9
Proposed stories
9
Existing dwelling units
122
Proposed dwelling units
122
General construction