NYC DOB record · Q00623043-S1

58-74 57 Street

58-74 57 Street, Queens, NY 11378

Alteration filing in Maspeth, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00623043-S1

58-74 57 Street

Queens, NY 11378

Alteration filing · status dated Nov 3, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00623043-S1 as a alteration filing at 58-74 57 Street, Queens, NY 11378. Its latest published status category is Approved, dated Nov 3, 2026. The filing records 4 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 3, 2026
Proposed scale
4 proposed stories
The building, not the filingEvery filing at BIN 4059130, with the parcel and violation recordApplicant of recordSee the 82 filings that name Shenoy Engineering, P.C.
FiledDec 2, 2021
Current recordApproved
Proposed scale4 stories
Recorded cost$2.2M

What the filing says

A public-record reading of the proposed work.

Selective removals of existing ventilation system. Provide new Ventilation system.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story educational building built in 1920, on a 40,200 sq ft lot.

Built
1920
Floors
3
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
M1-1
Lot area
40,200 sq ft
Building area
36,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 6, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00623043-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 92,577 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00623043-S1
BBL
4026310106
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
0
Proposed dwelling units
0