What the filing says
A public-record reading of the proposed work.
Tilden campus. application is filed for fire alarm replacement work. no change in use, egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story educational building built in 1929, on a 276,000 sq ft lot.
- Built
- 1929
- Last altered
- 2006
- Floors
- 4
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R4
- Lot area
- 276,000 sq ft
- Building area
- 302,208 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 27, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 30 open notices on record for this building, out of 136 notices on file; the most recent was issued Sep 6, 2019.
- (other bldgs types) - elevator affirmation of
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
- (other bldgs types) - elevator affirmation of
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
- (other bldgs types) - elevator affirmation of
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
27 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00972547-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00972547-I1
- BBL
- 3047420001
- Postal code
- 11203 · 1374 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0