What the filing says
A public-record reading of the proposed work.
Plumbing work of exist. laundry establishment with, replace/new dryer, washer, sink as per plan. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story mainly residential with some commercial built in 1931, with 5 homes, on a 2,517 sq ft lot.
- Built
- 1931
- Last altered
- 1962
- Floors
- 2
- Residential units
- 5
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6A
- Lot area
- 2,517 sq ft
- Building area
- 4,480 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 37 notices on file; the most recent was issued Apr 8, 1998.
- Construction
Issued Apr 8, 1998 — NO SIGN PERMIT. THREE (3) SIGNS ERECTED ON PREMISES, ONE (1) ON FRONT OF PREMISES APPROX 3' HIGH AND 2' LONG, "LAUNDROMAT" SECOND SIGN ON 57TH ST SIDE OF PREMISES APPROX 3' HIGH AND 10' LONG "SUNRISE WASH & DRY. THIRD SIGN HANGING VERTICALLY ON FRONT OF PREMISES READS "SUNRISE LAUNDROMAT" APPROX 2 1/2' WIDE AND 10' HIGH. SIGNS ARE NOT LIGHTED
- Local law 62/91 - boilers
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01462551-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 69,387 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01462551-S1
- BBL
- 3008570010
- Postal code
- 11220 · 3056 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 5
- Proposed dwelling units
- 5








