What the filing says
A public-record reading of the proposed work.
Mechanical work filed in conjunction with the interior renovation of existing commercial store as per plan. No change in use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 1873, with 22 homes, on a 3,432 sq ft lot.
- Built
- 1873
- Floors
- 5
- Residential units
- 22
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C1-6
- Lot area
- 3,432 sq ft
- Building area
- 16,700 sq ft
- Historic district
- Greenwich Village Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 19 notices on file; the most recent was issued Apr 1, 2024.
- Construction
Issued Apr 1, 2024 — FAILURE TO MAINT.EXTERIOR BLDG WALLS &APPURT.ON EXPO#1&2 SIDEWALK SHED &PIPE SCAFFOLDING IN PLACE WITH NETTING AROOUND PIPE SCAFFOLDING.ON EXP#3 SOUTH ELEV.CRACKS &SPALLING BRICK&STUCCO,EXP#4 W.ELEV.CRACKS IN PARAPET ROOF DAMAGE BRICK ON PARAPET CRACK IN BULKHEAD.REMEDY:PROVIDE ADEQUATE SAFETY MEASURES,REPAIR DAMAGED FACADE AS PER 1 RCNY-103-04
- Construction
Issued Aug 16, 2023 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.BUILDING HAS HAZARDOUS DETERIORATING CONDITIONS SUCH AS MISSING BRICK, CRACKS,STEP, CRACKS,BULGING,SPALLING AND DAMAGED JOINTS. REMEDY:MAINTAIN BUILDING: REPAIR AND OR REPLACE
- Construction
Issued Jun 5, 2023 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.BUILDING HAS DETERIORATING CONDITIONS AT ALL VIEWS EXPOSURES.FAILING LINTEL,STEP CRACKS,CRACK/DAMAGED STONE WORK,DAMAGED WINDOW JAMB.DEGRADED MORTAR AND SPALLING.REMEDY:MAINTAIN BUILDING.REPAIR AND OR REPLACE
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01350996-S6.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01350996-S6
- BBL
- 1006340060
- Postal code
- 10014 · 489 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 22
- Proposed dwelling units
- 22