NYC DOB record · B00585110-I1

585 Schenectady Avenue

585 Schenectady Avenue, Brooklyn, NY 11203

Alteration filing in East Flatbush-Rugby, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00585110-I1

585 Schenectady Avenue

Brooklyn, NY 11203

Alteration filing · status dated Feb 19, 2024

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00585110-I1 as a alteration filing at 585 Schenectady Avenue, Brooklyn, NY 11203. Its latest published status category is Recorded as completed, dated Feb 19, 2024. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Feb 19, 2024
Proposed scale
1 proposed dwelling unit
The building, not the filingEvery filing at BIN 3327565, with the parcel and violation recordApplicant of recordSee the 574 filings that name Fl&m Engineering Design &inspection
FiledMay 13, 2022
Current recordRecorded as completed
Proposed scale1 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

INSTALLATION OF 300 psf SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENTS SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 11-story health facility built in 1975, on a 44,313 sq ft lot.

Built
1975
Last altered
1997
Floors
11
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R6
Lot area
44,313 sq ft
Building area
250,190 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 48 open notices on record for this building, out of 190 notices on file; the most recent was issued Nov 14, 2025.

  • High pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION

  • 45 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00585110-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00585110-I1
BBL
3046020005
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1
Sidewalk shed