NYC DOB record · M01164228-I1

59 Maiden Lane

59 Maiden Lane, Manhattan, NY 10038

Alteration filing in Financial District-Battery Park City, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01164228-I1

59 Maiden Lane

Manhattan, NY 10038

Alteration filing · status dated Aug 20, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01164228-I1 as a alteration filing at 59 Maiden Lane, Manhattan, NY 10038. Its latest published status category is Approved, dated Aug 20, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 20, 2026
Proposed scale
Not stated in this filing
Complete building dossierView all 10 filings associated with BIN 1079043
FiledAug 25, 2025
Current recordApproved
Proposed scaleNot specified
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary netting protection system per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 44-story office building built in 1965, on a 59,391 sq ft lot.

Built
1965
Floors
44
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-5
Lot area
59,391 sq ft
Building area
1,073,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 15 open notices on record for this building, out of 273 notices on file; the most recent was issued Sep 5, 2024.

  • Construction

    Issued Sep 5, 2024 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. TIME OF INSPECTION EXP 1 S ELEV,EXP#1 CRACKS IN BRICK WORK ON MULT FLRS;SPALLED BRICK @ WATER COOLER,BRICK EXP 2 E MISSING SECTION OF BRICK ON SEVERAL FLOORS EXP3 N, MISSING SECTION ON BRICK ON SEVERAL FLORS SPALLING MASONRY CRACK/DAMAGED CONCRETE BEAMS & COLMN.REMEDY REPAIR AND/OR REPLACE

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Construction

    Issued Aug 31, 2023 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED OPEN MASONRY ON EXPOSURES 3&4 IN MULTIPLE LOCATIONS.REMEDY:FIX AND OR REPLACE

  • 12 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01164228-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01164228-I1
BBL
1000670001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0