What the filing says
A public-record reading of the proposed work.
To install (2) sprinkler heads on hydro carbon cleaning machine at existing dry cleaning store. no change in use egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1920, on a 1,680 sq ft lot.
- Built
- 1920
- Floors
- 3
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6B
- Lot area
- 1,680 sq ft
- Building area
- 3,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 5 notices on file; the most recent was issued Jun 20, 2023.
- High pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
- High pressure boiler
Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
- Construction
Issued Jun 23, 2022 — EMERGENCY WORK-BLDG DAMAGED BY CAR IMPACT ON 6/23/2022.THE NORTHWEST COLUMN WAS SEVERELY DAMAGED & DISPLACED.THE BUILDING IS STRUCTURALLY COMPROMISED.THERE IS POTENTIAL COLLAPSE IMMED INSTLL TEMP SHORNG @N-W CRNR UNDR DIRCT &CONT SUPRVOF PE.INSTALL FENCE @NORTH & WEST.FILE PRMT W/IN 48HRS WRK STRT
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00536865-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00536865-I1
- BBL
- 3027570005
- Postal code
- 11211 · 3620 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








