What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1920, with 4 homes, on a 1,685 sq ft lot.
- Built
- 1920
- Last altered
- 1988
- Floors
- 4
- Residential units
- 4
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- C4-4D
- Lot area
- 1,685 sq ft
- Building area
- 3,555 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Sep 10, 2026.
- Construction
Issued Sep 10, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE.NOTED AT TIME OF INSPECTION AT EXP1 VER TICAL STEP CRACK,DAMAGED PARAPET MASONRY AND FLASHING LONG VERTICAL CR ACK.AT EXP1,CRACKING AND SEVERELY LONG VERTICAL CRACK.AT EXP4 DAMAGED AND EXPOSED CRACKED BRICK AND MORTAR.REMEDY:REPAIR AND/OR REPLACE
- Construction
Issued Sep 8, 2026 — NOTED AT THE TIME OF INSPECTION, OBSERVED CRACKED AND DETERIORATED BRICK MASONRY AT THE ROOF PARAPET ALONG EXPOSURE #4, RIGHT SIDE OF THE PROPERTY.
- Construction
Issued Feb 23, 2011 — WORK WITHOUT A PERMIT: ILLEGAL WORK NOTED AT 3RD FLR. APT. NEW PARTITO N WALL ERECTED, NEW ELECTRICAL WIRING REMEDY: STOP ALL WORK IMMEDIATELY OBTAIN PE RMIT S FOR WORK DONE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B08011846-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B08011846-I1
- BIN
- 3006475
- BBL
- 3004070025
- Postal code
- 11217 · 3430 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 4
- Proposed dwelling units
- 4