What the filing says
A public-record reading of the proposed work.
Scope: brick masonry replacement, cutting & repointing mortar joints, lintel replacement, waterproofing membrane installation, sill stone replacement (incl. membrane), metal surface restoration, balcony railing installation & existing balcony replacement.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1962, with 126 homes, on a 44,130 sq ft lot.
- Built
- 1962
- Floors
- 6
- Residential units
- 126
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R5
- Lot area
- 44,130 sq ft
- Building area
- 131,413 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 43 notices on file; the most recent was issued Mar 5, 2025.
- Fail to certify class
Issued Mar 5, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Dec 7, 2024 — EMO DUE TO DEFECTIVE PARKING STRUCT. OBSERVED SPALLING, CRACKED CONCRE -TE @ BEAMS @ MULTI LOCAT. REMEDY: IMMEDLY IMPLEMENTADEQUATE SAFETY MEAS TO PROTECT ACCESS TO THOSE AREA & PROVIDE PROTECTN SHORED AND/OR UNSAFE AREAS, ENSURING CLEAR DELINEATION & SAFE NAVIGAT GROUND SHORED AND/OR UNSAFE AREAS. PROVIDE PROTECTION TO SAFEGUARD DRIVER & PEDESTRN
- Construction
Issued Oct 31, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. EXP#3 NE CORNER BALCONY WITH SEVERELY DETERIORATING CONDITIONS. INCLUDING SPALLING/ LOOSE DEBRIS EXPOSING REBAR IN MULTIPLE BALCONIES.AT EXPOSURE #3 OBSERVED 2 BROKEN WINDOW AT 2ND FLOOR. AT EXPOSURE #3 OBSERVED SEVERAL STEP CRACKS. REMEDY: REPAIR AND/OR REPLACE
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01420992-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01420992-I1
- BIN
- 4027128
- BBL
- 4011880055
- Postal code
- 11377 · 159 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 126
- Proposed dwelling units
- 126