NYC DOB record · B00248490-I1

60 Broadway

60 Broadway, Brooklyn, NY 11249

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00248490-I1

60 Broadway

Brooklyn, NY 11249

Alteration filing · status dated Dec 27, 2020

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
130
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00248490-I1 as a alteration filing at 60 Broadway, Brooklyn, NY 11249. Its latest published status category is Recorded as completed, dated Dec 27, 2020. The filing records 130 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 27, 2020
Proposed scale
130 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 3059506Applicant of recordSee the 190 filings that name Nyx Engineering, PLLC
FiledOct 19, 2019
Current recordRecorded as completed
Proposed scale130 units
Recorded cost$3,000

What the filing says

A public-record reading of the proposed work.

Proposed illuminated channel letters on aluminum raceway for first floor storefront. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story condominium built in 1916, with 130 homes, on a 26,529 sq ft lot.

Built
1916
Floors
12
Residential units
130
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C4-3
Lot area
26,529 sq ft
Building area
180,853 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 40 open notices on record for this building, out of 86 notices on file; the most recent was issued Jun 23, 2024.

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • 37 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 9, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00248490-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04
  5. Current status updated

    The latest recorded filing status is “LOC Issued.”

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00248490-I1
BBL
3021307501
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
130
Proposed dwelling units
130