What the filing says
A public-record reading of the proposed work.
NYCHA BOILER-CARVER_BLDG #5_Provide a temporary boiler plant to serve the existing facilities during demolition of the existing boiler plant and construction of the new facility boiler plant.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 15-story elevator apartment building built in 1954, with 564 homes, on a 274,240 sq ft lot.
- Built
- 1954
- Floors
- 15
- Residential units
- 564
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-2
- Lot area
- 274,240 sq ft
- Building area
- 484,479 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 24 notices on file; the most recent was issued Jun 3, 2026.
- Construction
Issued Jun 3, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED THE FOLLOWING CONDITIONS. BROKEN WINDOW PANE AT THE 13 FLOOR AND DAMAGED JOINT ON EXPOSURE 3, SOUTH ELEVATION PARK AVENUE. REMEDY: REPAIR AND/OR REPLACE
- Facade safety program
Issued Jan 14, 2020
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00559646-S3.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “On Hold - Pending Supersede of Applicant of Record.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,982 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00559646-S3
- BBL
- 1016050024
- Postal code
- 10029 · 467 filings
- Review type
- Standard Plan Examination
- Existing stories
- 16
- Proposed stories
- 16
- Existing dwelling units
- 118
- Proposed dwelling units
- 118