What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 NYC building code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1954, with 815 homes, on a 658,440 sq ft lot.
- Built
- 1954
- Floors
- 7
- Residential units
- 815
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 658,440 sq ft
- Building area
- 771,366 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 13 notices on file; the most recent was issued Jun 3, 2025.
- Construction
Issued Jun 3, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT TIME OF INSPECTION,OBSERVED ON EXP1,2,3&4 ELEVATIONS STEP CRACKS AND DAMAG ED MORTAR JOINGS AT PARAPET AND ON 13TH FL LINTELS.AC INADEQUATELY SUP PORTED ON SEVERAL FLOORS AND EXP3 EAST ELEV LOOSE SAFETY GRILL ON 13TH FL.DAMAGED MORTAR BENEATH 13TH FL WINDOW.REMEDY:REPAIR OR REPLACE
- Facade safety program
Issued Jun 24, 2019
- Facade safety program
Issued Jun 24, 2019
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01394893-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01394893-I1
- BBL
- 3034890001
- Postal code
- 11212 · 2132 filings
- Review type
- Professional Certification
- Existing stories
- 13
- Proposed stories
- 13
- Existing dwelling units
- 96
- Proposed dwelling units
- 96








