What the filing says
A public-record reading of the proposed work.
1.AREA OF WORK: 1 ST FLOOR AND MEZZANINE ABOVE ONLY.2.INSTALL 2 NEW GAS FlRED HOT WATER BOILERS.3.RECONNECT NEWLY INSTALLED BOILERS TO EXISTING AH'S, EXISTING ASSOCIATED PIPING, NEW VENTS.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story place of worship built in 1951, on a 44,793 sq ft lot.
- Built
- 1951
- Floors
- 7
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R6
- Lot area
- 44,793 sq ft
- Building area
- 116,264 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 26 notices on file; the most recent was issued Jun 5, 2024.
- Construction
Issued Jun 5, 2024 — PARTIAL VACATE ORDER DUE TO UNSAFE NOTIFICATION FILED FOR 60 WEST END AVE AS OBSERVED OF CRACKED AND DISPLACED BRICKS AT COURTYARD WEST ELEV ATION AND DETERIORATED BRICKS AS WELL AS UNSECURED HAZARD MATERIALS AT PLAYGROUND AT NORTH ELEV.THESE CONDITIONS HAVE THEREFORE MADE THE ENTI RE COURTYARD AND PLAYGROUND UNABLE TO BE OCCUPIED.REMEDY:VACATE
- Hazardous condition (facade)
Issued Jun 2, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Construction
Issued May 29, 2024 — EMERGENCY WORK ORDER DUE TO CRACKED,SPALLING AND DETERIORATED BRICK FA CE AND STONE AS DETERIORATED MORTAR JOINTS AT MULTIPLE LOCATIONS AT EX P1 EAST ELEV AND EXP2 SOUTH ELEV AND EXP3 WEST ELEV.REMEDY:PROVIDE ADE QUATE SAFETY MEASURES.REPAIR UNSAFE FACADE AS PER 1RCNY 103.04.FILE AS UNSAFE REPORT
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00447173-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00447173-I1
- BBL
- 3087130077
- Postal code
- 11235 · 1783 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0