NYC DOB record · B00351345-I1

600 Euclid Avenue

600 Euclid Avenue, Brooklyn, NY 11208

Alteration filing in East New York-City Line, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00351345-I1

600 Euclid Avenue

Brooklyn, NY 11208

Alteration filing · status dated Dec 27, 2020

Current record
Approved
Proposed scale
Not stated
Dwelling units
98
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00351345-I1 as a alteration filing at 600 Euclid Avenue, Brooklyn, NY 11208. Its latest published status category is Approved, dated Dec 27, 2020. The filing records 98 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 27, 2020
Proposed scale
98 proposed dwelling units
Complete building dossierView all 10 filings associated with BIN 3337020Applicant of recordSee the 194 filings that name Dseny Engineering Services, PC
FiledJul 8, 2020
Current recordApproved
Proposed scale98 units
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

SF/NYCHA Cypress Hills (BLDG #7 ) SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD) TO PROTECT PUBLIC FROM WORK AREAS .NO CHANGE IN USE, OCCUPANCY OR EGRESS

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 1954, with 1444 homes, on a 1,317,803 sq ft lot.

Built
1954
Floors
7
Residential units
1444
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R5
Lot area
1,317,803 sq ft
Building area
1,136,208 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 26 notices on file; the most recent was issued Nov 14, 2025.

  • High pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION

  • 14 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00351345-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00351345-I1
BBL
3042920061
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
98
Proposed dwelling units
98