What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1937, with 116 homes, on a 24,375 sq ft lot.
- Built
- 1937
- Floors
- 7
- Residential units
- 116
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 24,375 sq ft
- Building area
- 108,757 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 39 notices on file; the most recent was issued Mar 8, 2024.
- Construction
Issued Mar 8, 2024 — EMERGENCY WORK ORDER.BLDG SFFRD A FIRE ON 3/4/24.ROOF OPEN OVER "12" LINE.STRCTRL DAMAGE TO FLRS@APARTMENTS 512 & 612.FIRE,WATER,&SMOKE DAMAGE THROUGHOUT.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #030524FEU21101AK (CONTROL #343467)IMMEDIATELY
- Construction
Issued Mar 5, 2024 — FTM.BLDG SFFRD A FIRE ON 3/4/24.ROOF OPEN OVER "12"LINES STRCTRL DAMAGE TO FLOORS@APARTMENTS 512&612.FIRE,WATER,SMOKE DAMAGE THROUGHOUT OWNR TO ENGAGE NYSPE&ENDRSD CONCTRACTOR TO EVAL THE ENTIRE BLDG&REPAIR UNDR PRMT.OBTAIN PRMT TO RPAIR BY 3/26/24
- Construction
Issued Mar 5, 2024 — EMERGENCY WORK ORDER.BLDG SFFRD A FIRE ON 3/4/24.ROOF OPEN OVER "12" LINE.STRCTRL DAMAGE TO FLRS@APARTMENTS 512&612.FIRE,WATER,&SMOKE DAMAGE THROUGHOUT.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #030524FEU21101AK (CONTROL #343467)IMMEDIATELY
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01484780-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,006 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01484780-I1
- BIN
- 2049724
- BBL
- 2043370001
- Postal code
- 10467 · 372 filings
- Review type
- Professional Certification
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 116
- Proposed dwelling units
- 116