What the filing says
A public-record reading of the proposed work.
Remove and replace single walled fill boxes and under dispenser containment boxes associated with USTs 1A,2A and 3A with double wall fiberglass, hydrostatically monitored, spill boxes and UDCs. Replace magnetostrictive probe and piping in tank sumps
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story garage or fuel station built in 1969, on a 52,700 sq ft lot.
- Built
- 1969
- Last altered
- 2010
- Floors
- 1
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- M1-1
- Lot area
- 52,700 sq ft
- Building area
- 52,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 5 notices on file; the most recent was issued May 2, 2025.
- Construction
Issued May 2, 2025 — EMERGENCY WORK ORDER DUE TO BROKEN WINDOW GLASS AT ALL EXPS. FACADE BRICKS BULGING AT EXP#1 (WEST ELEVATION) REMEDY: IMMEDIATELY TAKE & PROVIDE SAFETY MEASURES TO SECURE AND PROTECT THE PUBLIC AND INSTALL SAFETY MEASURES AT ALL EXPOSURES. MAKE IMMEDIATE REPAIRS UNDER SUPERVISION OF LICENSED PROFESSIONAL
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00517517-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00517517-I1
- BBL
- 3045620001
- Postal code
- 11208 · 1722 filings
- Review type
- Standard Plan Examination
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0