What the filing says
A public-record reading of the proposed work.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1961, with 103 homes, on a 28,860 sq ft lot.
- Built
- 1961
- Floors
- 6
- Residential units
- 103
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 28,860 sq ft
- Building area
- 107,627 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 42 notices on file; the most recent was issued Mar 16, 2024.
- Construction
Issued Mar 16, 2024 — FAILURE TO FILE RETAINING WALL ASSESSMENT REPORT. RETAINING WALL OVER 10 FT IN HEIGHT & PUBLICALLY ACCESSABLE. OWNER HAS NOT FILED A TRIG STRUCTURAL ASSESSMENT REPORT AS REQUIRED BY THE CODE. REMEDY: IMMEDIATELY RETAIN A LICENSED PROFESSIONAL ENGINEER & QRWI AND SUBMIT A TRIG REPORT TO THE RW UNIT
- Construction
Issued Mar 8, 2024 — DEFECTIVE RETAINING WALL LOCATED AT THE PARKING LOT OF THE PROPERTY; WE BELIEVE THE ISSUE IS SOURCED FROM THE CITY SEWAGE SYSTEM.WE WOULD LIKE BOTH A DEP INSPECTOR AS WELL AS A CITY INSPECTOR TO COME AND LOOK AT IT.FAILURE TO MAINTAIN RW IN A SAFE CONDITION AT THE TIME OF INSPECTION REMEDY:RETAIN A (L.S.E)FILED REPORT BY 4/8/24
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01193736-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01193736-I1
- BBL
- 2058021294
- Postal code
- 10471 · 93 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 103
- Proposed dwelling units
- 103








