NYC DOB record · Q00993366-I1

61-11 166 Street

61-11 166 Street, Queens, NY 11365

New building filing in Fresh Meadows-Utopia, Queens. The latest DOB status is co issued.

A Certificate of Occupancy has been issued, which is what makes a space legal to occupy. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00993366-I1

61-11 166 Street

Queens, NY 11365

New building · status dated Sep 21, 2026

Current record
Recorded as completed
Proposed scale
3 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00993366-I1 as a new building at 61-11 166 Street, Queens, NY 11365. Its latest published status category is Recorded as completed, dated Sep 21, 2026. The filing records 3 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
Sep 21, 2026
Proposed scale
3 proposed stories and 3 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 4624897Applicant of recordSee the 227 filings that name Ameriland Brook LLC
FiledJan 21, 2024
Current recordRecorded as completed
Proposed scale3 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Propose a new three story with three family house. obtain new c of o

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 2024, with 3 homes, on a 3,050 sq ft lot.

Built
2024
Floors
3
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R4
Lot area
3,050 sq ft
Building area
3,964 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00993366-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “CO Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00993366-I1
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
3
Existing dwelling units
Empty in the source
Proposed dwelling units
3
General constructionStructural workFoundation workEarthwork