NYC DOB record · X01414544-I1

611 East 149 Street

611 East 149 Street, Bronx, NY 10455

Alteration filing in Melrose, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01414544-I1

611 East 149 Street

Bronx, NY 10455

Alteration filing · status dated Aug 28, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
39
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01414544-I1 as a alteration filing at 611 East 149 Street, Bronx, NY 10455. Its latest published status category is Approved, dated Aug 28, 2026. The filing records 6 proposed stories and 39 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 28, 2026
Proposed scale
6 proposed stories and 39 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 2004415Applicant of recordSee the 412 filings that name Ak Consulting Services, Inc
FiledJun 12, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$15,055

What the filing says

A public-record reading of the proposed work.

Facade restoration work as per indicated on plan. there will be no change in the use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story elevator apartment building built in 1923, with 39 homes, on a 10,705 sq ft lot.

Built
1923
Last altered
1982
Floors
5
Residential units
39
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
10,705 sq ft
Building area
50,254 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 37 notices on file; the most recent was issued Feb 15, 2026.

  • Construction

    Issued Feb 15, 2026 — STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. APPROX 16X16 SECTION OF SIDEWALK SHED BRACING, DECKING, AND SUPPORT BEAMS PARTIALLY COLLAPSED AT EXPOSURE 4 CORNER OF CAULDWELL AND EAST 149 STREET. DUE TO CAR IMPACT

  • No report and / or late filing (facade)

    Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 14 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01414544-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01414544-I1
BBL
2026230060
Review type
Professional Certification
Existing stories
6
Proposed stories
6
Existing dwelling units
39
Proposed dwelling units
39
General construction