What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter # 33 of the NYC code 2022, no changes in use egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1962, with 86 homes, on a 27,950 sq ft lot.
- Built
- 1962
- Floors
- 6
- Residential units
- 86
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 27,950 sq ft
- Building area
- 98,258 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 48 notices on file; the most recent was issued Jan 11, 2025.
- Construction
Issued Jan 11, 2025 — EWO DUE TO FACADE DEFECTIVE OBSERVED. @ EXP1 W ELEV. CRACKED/SPALLING/ BULGE MASONRY ABOVE THE MAIN ENTERANCE. ALSO @ EXP 2-4 & ROOF OBSERVED CRACKED @ MULTI LOCAT. REMEDY: IMMEDLY TAKE/PROVIDE SAFETY MEASURE TO SECURE/PROTECT THE PUBLIC & INSTALL PUBLIC PROTECTION AT ALL EXPOSURES ALSO REMOVE ALL LOOSE MATERIAL
- Elevator
Issued Aug 21, 1989 — (74)LOCK MOTOR ROOM (76)REPAIR MOTOR ROOM LIGHT SWITCH
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01171804-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01171804-I1
- BIN
- 2084352
- BBL
- 2058141195
- Postal code
- 10471 · 75 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 84
- Proposed dwelling units
- 84