What the filing says
A public-record reading of the proposed work.
Installation of supported scaffolding in accordance with nycc 2014 chapter 33 building code. no change in egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 1,867 sq ft lot.
- Last altered
- 2023
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- R7A
- Lot area
- 1,867 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 15 notices on file; the most recent was issued Apr 2, 2025.
- Construction
Issued Apr 2, 2025 — UNSAFE OPN EXCAV. ON VACANT&STALLED SITE.REMNANT FDN WALLS INADEQUATLY SUPPORT~8FT TALL SOIL SHEAR CUT; ~15FTOF SIDEWALK @EXP#2PART.COLLAPSED @EDGE OF EXCAV. REMEDY: RETAIN NYS RDP TO EVAL ADJ PROPERTIES TO RECEIVE LOADS FROM BACKFILL. BACKFILL AND GRADE SITE TO TOC ELEVATION
- Unsafe
Issued Apr 2, 2025
- Construction
Issued Feb 8, 2024 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT# 321918626 ON 2/7/24. CONTRACTOR WITHDRAWAL.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00585736-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00585736-I1
- BBL
- 3019110023
- Postal code
- 11205 · 2318 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








