What the filing says
A public-record reading of the proposed work.
Provide new structural support for rooftop unit on 2nd floor roof setback in the existing hospital building as per plans filed herewith only.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 22-story health facility built in 1930, on a 364,433 sq ft lot.
- Built
- 1930
- Last altered
- 2024
- Floors
- 22
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R8
- Lot area
- 364,433 sq ft
- Building area
- 3,533,539 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 28, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Nov 1, 2023.
- Failure to correct swarmp conditions (facade)
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
- Plumbing
Issued Dec 19, 2022 — FAILURE TO PROVIDE APPROVED / ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION I OBSERVED NO PLANS ON SITE AT TIME OF SPOT CHECK INSPECTION FOR EIGHTH FLOOR FOR SPRINKLER FINISH FOR JOB NUMBER M99527306
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 28, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01247427-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,094 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01247427-P1
- BBL
- 1021380040
- Postal code
- 10032 · 138 filings
- Review type
- Professional Certification
- Existing stories
- 24
- Proposed stories
- 24
- Existing dwelling units
- 0
- Proposed dwelling units
- 0