What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story condominium built in 1917, with 70 homes, on a 16,453 sq ft lot.
- Built
- 1917
- Last altered
- 1990
- Floors
- 8
- Residential units
- 70
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R7A
- Lot area
- 16,453 sq ft
- Building area
- 70,403 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 67 notices on file; the most recent was issued Aug 30, 2013.
- No report and / or late filing (facade)
Issued Aug 30, 2013 — FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
- Low pressure boiler
Issued Mar 1, 2013 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
- Elevator
Issued Dec 28, 2012
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00115447-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,295 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00115447-I1
- BBL
- 3003207502
- Postal code
- 11231 · 2799 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source