NYC DOB record · B00582295-I1

630 Flushing Avenue

630 Flushing Avenue, Brooklyn, NY 11206

Alteration filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00582295-I1

630 Flushing Avenue

Brooklyn, NY 11206

Alteration filing · status dated Feb 14, 2023

Current record
Recorded as completed
Proposed scale
8 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00582295-I1 as a alteration filing at 630 Flushing Avenue, Brooklyn, NY 11206. Its latest published status category is Recorded as completed, dated Feb 14, 2023. The filing records 8 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Feb 14, 2023
Proposed scale
8 proposed stories
The building, not the filingEvery filing at BIN 3329628, with the parcel and violation recordApplicant of recordSee the 32 filings that name Bromley Caldari Architects
FiledSep 27, 2021
Current recordRecorded as completed
Proposed scale8 stories
Recorded cost$40,000

What the filing says

A public-record reading of the proposed work.

Removal and installation of interior non-load bearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story factory or industrial building built in 1930, on a 145,000 sq ft lot.

Built
1930
Last altered
2015
Floors
8
Residential units
0
Building type
Factory or industrial building
Land use
Industrial and manufacturing
Zoning district
M1-3
Lot area
145,000 sq ft
Building area
574,055 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 9 notices on file; the most recent was issued Feb 17, 2023.

  • Hazardous condition (facade)

    Issued Feb 17, 2023 — CYCLE 9B UNSAFE REPORT FILED

  • Fail to certify class

    Issued Aug 22, 2019 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Fail to certify class

    Issued Aug 22, 2019 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00582295-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00582295-I1
BBL
3017200001
Review type
Professional Certification
Existing stories
8
Proposed stories
8
Existing dwelling units
0
Proposed dwelling units
0
General construction