NYC DOB record · M01286413-P1

635 Park Avenue

635 Park Avenue, Manhattan, NY 10065

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 9, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01286413-P1

635 Park Avenue

Manhattan, NY 10065

Alteration filing · status dated Sep 4, 2026

Current record
Approved
Proposed scale
12 stories
Dwelling units
14
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01286413-P1 as a alteration filing at 635 Park Avenue, Manhattan, NY 10065. Its latest published status category is Approved, dated Sep 4, 2026. The filing records 12 proposed stories and 14 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 4, 2026
Proposed scale
12 proposed stories and 14 proposed dwelling units
Complete building dossierView all 4 filings associated with BIN 1042448Applicant of recordSee the 5 filings that name H. Randall Goya Architect
FiledAug 18, 2026
Current recordApproved
Proposed scale12 stories
Recorded cost$1.5M

What the filing says

A public-record reading of the proposed work.

Minor interior renovations, partitions, finishes to apartment on 9th floor. no change to use egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 13-story elevator apartment building built in 1913, with 16 homes, on a 6,034 sq ft lot.

Built
1913
Last altered
2019
Floors
13
Residential units
16
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
6,034 sq ft
Building area
67,600 sq ft
Historic district
Upper East Side Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 9, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 39 notices on file; the most recent was issued Oct 19, 2022.

  • Hazardous condition (facade)

    Issued Oct 19, 2022 — CYCLE 9B UNSAFE REPORT FILED

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 9, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01286413-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01286413-P1
BBL
1014000069
Review type
Standard Plan Examination
Existing stories
12
Proposed stories
12
Existing dwelling units
14
Proposed dwelling units
14
General construction