What the filing says
A public-record reading of the proposed work.
Interior renovation of existing eating and drinking establishment with new plumbing fixtures adn replacement of existing gas kitchen equipment. no change in infrastructure.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1899, on a 1,675 sq ft lot.
- Built
- 1899
- Last altered
- 2018
- Floors
- 3
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6B
- Lot area
- 1,675 sq ft
- Building area
- 3,525 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 24 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Apr 9, 2020 — BOROUGH COMM. HAS ORDERED ALL WORK STOPED UNDER PERMIT#321536758 ON 4/ 8/20 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL/STOP ALL WORK IMMED IATELY AND MAKE SITE SAFE CALL BOROUGH COMM. OFFICE AT 718 802-3677 W/ APPROPIATE INFORMATION
- Construction
Issued Apr 9, 2020 — BOROUGH COMM. SWO /BOROUGH COMM. HAS ORDERED ALL WORK STOPPED UNDER PERMIT#321556758 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL STOP ALL WORK /EXCEPT TO MAKE SITE SAFE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01445147-S2.
- Current status updated02
The latest recorded filing status is “Prof Cert QA Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01445147-S2
- BBL
- 3027460027
- Postal code
- 11211 · 3571 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2