NYC DOB record · Q01329555-I1

64-05 Woodside Avenue

64-05 Woodside Avenue, Queens, NY 11377

Alteration filing in Woodside, Queens. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01329555-I1

64-05 Woodside Avenue

Queens, NY 11377

Alteration filing · status dated Sep 18, 2026

Current record
Recorded as completed
Proposed scale
6 stories
Dwelling units
27
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01329555-I1 as a alteration filing at 64-05 Woodside Avenue, Queens, NY 11377. Its latest published status category is Recorded as completed, dated Sep 18, 2026. The filing records 6 proposed stories and 27 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 18, 2026
Proposed scale
6 proposed stories and 27 proposed dwelling units
Applicant of recordSee the 235 filings that name Design Studio Associates
FiledJan 12, 2026
Current recordRecorded as completed
Proposed scale6 stories
Recorded cost$9,720

What the filing says

A public-record reading of the proposed work.

Application filed to remedy ECB violation#: 39024783P & perform all necessary repairs to make balconies accessory to apartments 4F, 5F & 6C at exposure 3 safe.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story condominium built in 2011, with 27 homes, on a 6,583 sq ft lot.

Built
2011
Floors
6
Residential units
27
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R5D
Lot area
6,583 sq ft
Building area
24,084 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 39 notices on file; the most recent was issued Oct 5, 2025.

  • Construction

    Issued Oct 5, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPE CTION OBSERVED THE UNDERNEATH SECTION OF BALCONY CONSISTING OF WOOD FR AME WITH STUCCO HAS FALLEN AT APT. 4A/3A AND REMAINING BALCONIES IN QU ESTION FOR THE ENTIRE BUILDING. ENGINEERS REPORT ON ALL BALCONIES SUBMIT ENGINEERS REPORT TO ERTINSPECTIONS@BUILDINGS.NYC.GOV WITHIN 7 D

  • Failure to post energy

    Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to

    Issued Aug 2, 2024 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • 14 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01329555-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01329555-I1
BIN
4543423
BBL
4012967501
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
27
Proposed dwelling units
27
General construction