What the filing says
A public-record reading of the proposed work.
Installation of construction fence to protect site,during full demolition of ED issued by HPD.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 1,880 sq ft lot.
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- R6
- Lot area
- 1,880 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Apr 24, 2019.
- Construction
Issued Apr 24, 2019 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER # 334061 ISSUED ON 9/4/18 TO OBTAIN PERMIT BY 10/15/18 TO REPAIR BUILDING. AS OF 4/24/19 NO PERMIT HAS BEEN OBTAINED. COMPLY WITH COMMISSIONER'S ORDER # 334061 IMMEDIATELY
- Fail to certify class
Issued Oct 31, 2018 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Sep 4, 2018 — FTM 2 STRY+CELL SEMI ATTACH MASONRY WALLS&WOODFRAMED FLRS RESID BLDG IN DISREPAIR.SEVERE WATER DAMAGE THROUGHOUT.AT REAR 2NDFL HAS COLL ONTO 1STFL.SEVERE ROT DAMAGE NOTED&ROOF&1STFL FRAMING.REMEDY:OWN ENGAGE PE&CONT'R EVAL BLDG&REPAIR UNDER PERMIT.FILE FOR PERMIT NO LATER THAN 9/28/18.START WORK BY 10/15/18
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00214879-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00214879-I1
- BBL
- 3036390032
- Postal code
- 11212 · 2180 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








