What the filing says
A public-record reading of the proposed work.
Lintel replacements and other minor facade repairs in court yard and street facades of the building.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1922, with 65 homes, on a 17,230 sq ft lot.
- Built
- 1922
- Last altered
- 1992
- Floors
- 5
- Residential units
- 65
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6A
- Lot area
- 17,230 sq ft
- Building area
- 53,860 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 30 notices on file; the most recent was issued Aug 23, 2025.
- Construction
Issued Aug 23, 2025 — NOTED LOOSE CAPSTONES AT 650 E 231, BULGING FACADE EXP1/2 SIDE, AND CRACKING AT VARIOUS SIDES.
- Failure to post energy
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
10 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01472419-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01472419-I1
- BIN
- 2063242
- BBL
- 2048330064
- Postal code
- 10466 · 302 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 65
- Proposed dwelling units
- 65








