NYC DOB record · X08035066-S6

647 Elton Avenue

647 Elton Avenue, Bronx, NY 10455

New building filing in Melrose, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Aug 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X08035066-S6

647 Elton Avenue

Bronx, NY 10455

New building · status dated Aug 20, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X08035066-S6 as a new building at 647 Elton Avenue, Bronx, NY 10455. Its latest published status category is Approved, dated Aug 20, 2026. The filing records 5 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Aug 20, 2026
Proposed scale
5 proposed stories
Complete building dossierView all 3 filings associated with BIN 2131258
FiledApr 27, 2023
Current recordApproved
Proposed scale5 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Filing for new sprinkler and standpipe system in conjunction with NB job # X08035066-S1

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story educational building built in 2024, on a 14,721 sq ft lot.

Built
2024
Last altered
2023
Floors
5
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
C4-4
Lot area
14,721 sq ft
Building area
67,972 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 9 notices on file; the most recent was issued Nov 30, 2023.

  • Construction

    Issued Nov 30, 2023 — EXP1 ALONG ELTON AVE,EXP4 ALONG E153 ST,EXP2 PARTY WL WITH651 ELTON AVE.EXP1&3 WLS INADEQUATE BRACE DUE TO CUT FL DIAPHRAGMS.EXISTINTER SHORING UNBRACED@VARIOUS LOCATIONS.VERT CRCK@EXP 3/4 CRN 1-3FL.OWNR ENGAG NYSPE&GC IMMED-SHORE/BRACE INTR.BLDG & EXTR WALS,INSTAL SCAF @ PREIM,NYSPE PROV MEAN/METH TO FEU FOR APPROVAL

  • Construction

    Issued Nov 30, 2023 — PREMISES VACANT LOT. OBSERVED ADJACENT BUILDING ( 649 ELTON AVE ) FULL HEIGHTS MASONRY WALL AT REAR COLLAPSED AND FELL ON TO THIS PROPERTY. ALSO OBSERVED REMAINING WALL MASONRY WALL POTENTIAL COLLAPSE CONDITION AND COLLAPSE ZONE. A FULL VACATE ORDER ISSUED ON ENTIRE VACANT LOT.

  • Construction

    Issued Nov 30, 2023 — EXP2&4 PARTY WL W 649 & 653 RESPECTIVLY.EXP1&3 INADEQ BRACEDDUE TO CUT FL DIAPHRAGMS.EXIST INTR.SHORING UNBRACED @ VARIOUS LOCTNBLDG IN STATE OF DISREPAIR WITH SEVERLY DETERIORATED FLOORS.OWNR ENGAG NYSPE& GC IMMED SHORE/BRACE INTR BLD.&EXT WALLS INSTLL SCAF @ PERIM.NYSPE PROV MNS&METH TO FEU FOR APPROVAL

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X08035066-S6.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X08035066-S6
BBL
2023740086
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
5
Existing dwelling units
Empty in the source
Proposed dwelling units
0