NYC DOB record · B01474376-I1

65 Willoughby Avenue

65 Willoughby Avenue, Brooklyn, NY 11205

Alteration filing in Fort Greene, Brooklyn. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01474376-I1

65 Willoughby Avenue

Brooklyn, NY 11205

Alteration filing · status dated Oct 22, 2026

Current record
Under review
Proposed scale
6 stories
Dwelling units
29
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01474376-I1 as a alteration filing at 65 Willoughby Avenue, Brooklyn, NY 11205. Its latest published status category is Under review, dated Oct 22, 2026. The filing records 6 proposed stories and 29 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Oct 22, 2026
Proposed scale
6 proposed stories and 29 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3058389Applicant of recordSee the 207 filings that name Mohammad Ahead, PE
FiledOct 21, 2026
Current recordUnder review
Proposed scale6 stories
Recorded cost$70,000

What the filing says

A public-record reading of the proposed work.

Herewith filing for an application foran interior renovation to cellar andfloor 001. filing remove and replacepartitions, patch, repair and repaintsurfaces as required. no change in use, egress oroccupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1928, with 29 homes, on a 7,215 sq ft lot.

Built
1928
Floors
6
Residential units
29
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6B
Lot area
7,215 sq ft
Building area
27,702 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 37 notices on file; the most recent was issued Feb 17, 2022.

  • Hazardous condition (facade)

    Issued Feb 17, 2022 — CYCLE 9A UNSAFE REPORT FILED

  • Elevator

    Issued Jul 30, 2020

  • Local law 62/91 - boilers

    Issued Aug 16, 1993

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01474376-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01474376-I1
BBL
3020750001
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
29
Proposed dwelling units
29
General construction