What the filing says
A public-record reading of the proposed work.
Repairing facade of all exposures including restoring cracked or displaced ornamental stonework. pointing work and secure chimney bracing tocomply ecb violation no.#35719032j .no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1920, with 29 homes, on a 5,000 sq ft lot.
- Built
- 1920
- Floors
- 5
- Residential units
- 29
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 5,000 sq ft
- Building area
- 21,750 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 17 notices on file; the most recent was issued Oct 31, 2025.
- Construction
Issued Oct 31, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#348287 VIO#091125PI30102HZ DATED 09/11/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY/ 09/23/25. AS OF 10/31/25 THE CAP DOCUMENTS WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER UNDER 348287 VIO#091125PI30102HZ TO PROVIDE A CORRECTIVE ACTION PLAN,SUBMIT ALL REQUIRED DOCUMENTS
- Construction
Issued Oct 31, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#348286 VIO#091125PI30101HZ DATED 09/11/25 REQUIRING OWNER TO PROVIDE THE ANNUAL PARAPET OBSERVATION REPOT AS REQ'D FOR 2024.AS OF 10/31/25 THE ANNUAL PARAPET OBSERVATION REPORT WAS NOT REC'D BY 09/25/25. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348286 VIO#091125PI30101HZ
- Construction
Issued Sep 11, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD @ FRONT FACADE ORNAMENTAL STOME WORK MISSING MORAR IN BTWN CRACKED STONE WORK DISLODGMENT OF STONE WORK @ 4TH&5TH FLRS REAR PARAPET WALL IN DISREPAIR,DISLODGEMENT BRACING AROND CHIMNERY. OWNER TO IMMED RETAIN REG DESING PROF TO EVAL THE ENTIRE BLDG & TO SUBMIT A CORRECTIVE ACTION PLAN BY 9/23/2025
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01318245-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
- Current status updated05
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01318245-I1
- BBL
- 3027630014
- Postal code
- 11211 · 3743 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 31
- Proposed dwelling units
- 31