NYC DOB record · B01111428-I1

66 Central Avenue

66 Central Avenue, Brooklyn, NY 11206

New building filing in Bushwick (West), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 28, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01111428-I1

66 Central Avenue

Brooklyn, NY 11206

New building · status dated Oct 26, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01111428-I1 as a new building at 66 Central Avenue, Brooklyn, NY 11206. Its latest published status category is Approved, dated Oct 26, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 26, 2026
Proposed scale
1 proposed story
Applicant of recordSee the 171 filings that name Tectonic Engineering
FiledOct 15, 2024
Current recordApproved
Proposed scale1 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Per HUB consultation on February 13th with Rami Bitar. NB Filed herewith for battery energy storage system (ESS) as per plans filed herewith.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a garage or fuel station on a 15,134 sq ft lot.

Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
M3-1
Lot area
15,134 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 28, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01111428-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,037 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01111428-I1
BIN
3429929
BBL
3031630100
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
1
Existing dwelling units
Empty in the source
Proposed dwelling units
0
General construction