What the filing says
A public-record reading of the proposed work.
Domestic plumbing work. Relocate plumbing fixtures.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 22-story condominium built in 1958, on a 27,690 sq ft lot.
- Built
- 1958
- Last altered
- 1993
- Floors
- 22
- Residential units
- 0
- Building type
- Condominium
- Land use
- Commercial and office
- Zoning district
- C5-3
- Lot area
- 27,690 sq ft
- Building area
- 465,364 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 24 open notices on record for this building, out of 379 notices on file; the most recent was issued May 7, 2025.
- Failure to correct swarmp conditions (facade)
Issued May 7, 2025 — CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
- Fail to certify class
Issued Nov 13, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Hazardous condition (facade)
Issued Sep 16, 2024 — CYCLE 9A UNSAFE REPORT FILED
21 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01466168-S1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01466168-S1
- BBL
- 1013757502
- Postal code
- 10065 · 574 filings
- Review type
- Professional Certification
- Existing stories
- 22
- Proposed stories
- 22
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








