What the filing says
A public-record reading of the proposed work.
Convert existing sprinkler service to combined standpipe/sprinkler service. existing sprinkler piping and heads to be removed. new sprinkler piping, sprinkler heads and standpipe risers to be installed as per plan. filed in conjunction with 321387389.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 55 notices on file; the most recent was issued Apr 6, 2023.
- Construction
Issued Apr 6, 2023 — THE BOROUGH COMMISSION HAS ORDERED ALL WORK STOP UNDER APPLICATION # 321387389 IMMEDIATELY THE PERMIT HOLDER OF RECORD HAS INFORMED THE DEPARTMENT THAT HE OR SHE WITHDRAWN FROM PROJECT. THEREFORE, UNTIL A NEW PERMIT HOLDER IS IN PLACE TO ENSURE INSPECTIONS OCCUR AS REQUIRED BY ARTICLE 116 OF CHAPTER 1 OF TITLE 28 OF THE AC
- Construction
Issued Apr 6, 2023 — THE BOROUGH COMMISSION HAS ORDERED ALL WORK STOP UNDER APPLICATION # 321387389 IMMEDIATELY THE PERMIT HOLDER OF RECORD HAS INFORMED THE DEPARTMENT THAT HE OR SHE WITHDRAWN FROM PROJECT. THEREFORE, UNTIL A NEW PERMIT HOLDER IS IN PLACE TO ENSURE INSPECTIONS OCCUR AS REQUIRED BY ARTICLE 116 OF CHAPTER 1 OF TITLE 28 OF THE AC
- Construction
Issued Jul 22, 2021
2 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00292972-P3.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00292972-P3
- BBL
- 3011450021
- Postal code
- 11238 · 2035 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0