What the filing says
A public-record reading of the proposed work.
Installation of temporary construction fence as per plans. construction fence shall comply with chapter 33 of the 2022 NYC building code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1931, on a 2,700 sq ft lot.
- Built
- 1931
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R6
- Lot area
- 2,700 sq ft
- Building area
- 1,880 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 4 notices on file; the most recent was issued Aug 14, 2025.
- Construction
Issued Aug 14, 2025 — ENGR RPR INDENTIFIES UNDESIGNED,UNPERMITTED GUT RENO,SHORING, EXCAVATION &FDN WORK.BLDG COMPROMISED REQ'D TEMP STABILIZATION & BIWKLY INSPCTN.COMPLY W CODE.RETAIN NYS PE&GC 2 STABILIZE BLDG,PRE- FILE PLANS BY 815,PLANS BY 818,STRT BY 8/25,DAILY WRK RPRTS,INSPTN
- Construction
Issued Aug 5, 2025 — WORK WITHOUT PERMIT. ATOI, OBSERVED LARGE UNSUPPORTED EXCAVATED PIT AT REAR YARD OF THE BUILDING EXPOSURE 3 APPROX. 13'FT(L) X 30'FT(W), AND 6'FT DEEP WITH UNCAPPED REBARS PROTRUDING APPROX. 4'FT FROM BOTTOM OF THE PIT. NO SOE AT REAR & LEFT-SIDES. CREATING AN IMMEDIATELY HAZARDOUS CONDITION. NO PERMITS OR RECORDS ON BIS/DOB NOW FOR WORKED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01267474-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01267474-I1
- BBL
- 3048050021
- Postal code
- 11203 · 1463 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2