What the filing says
A public-record reading of the proposed work.
New installation of plumbing fixture in conjunction alteration job# M01456759-I1
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 30-story elevator apartment building built in 1970, with 203 homes, on a 25,177 sq ft lot.
- Built
- 1970
- Last altered
- 2017
- Floors
- 30
- Residential units
- 203
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C1-9
- Lot area
- 25,177 sq ft
- Building area
- 244,841 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 85 notices on file; the most recent was issued Jul 16, 2020.
- Elevator
Issued Jul 16, 2020
- Elevator
Issued Jul 16, 2020
- (other bldgs types) - elevator affirmation of
Issued May 30, 2014 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01456759-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01456759-S1
- BBL
- 1012060001
- Postal code
- 10025 · 581 filings
- Review type
- Professional Certification
- Existing stories
- 30
- Proposed stories
- 30
- Existing dwelling units
- 203
- Proposed dwelling units
- 203








