What the filing says
A public-record reading of the proposed work.
Foundation work in conjunction with Alt.1 340771748
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story two-family home built in 1901, on a 2,500 sq ft lot.
- Built
- 1901
- Floors
- 3
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R7A
- Lot area
- 2,500 sq ft
- Building area
- 2,640 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Nov 17, 2025.
- Construction
Issued Nov 17, 2025 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B00413103-S1 ON 11/13/25. SPECIAL INSPECTOR WITHDRAWAL. UNABLE TO DETERMINE PERCENTAGE OF WORK DUE TO SITE BEING CLOSED. STOP ALL WORK AND MAKE SITE SAFE.
- Construction
Issued Apr 27, 2022 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER.APPLICATION #340771748 ON 4/18/22 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL. NO ACCESS, WORK APPEARS TO 0% COMPLETE.
- Construction
Issued Apr 27, 2022 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #340771748 ON 4/18/22 DUE TO APPLICATION WITHDRAWAL. NO ACCESS, WORK APPEARS TO 0% COMPLETE.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00413103-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00413103-S1
- BBL
- 3027630018
- Postal code
- 11211 · 2687 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 1