What the filing says
A public-record reading of the proposed work.
Fence Application filed in conjunction with DOB Job #B01249173-I1
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1920, with 3 homes, on a 1,745 sq ft lot.
- Built
- 1920
- Floors
- 4
- Residential units
- 3
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- C4-4D
- Lot area
- 1,745 sq ft
- Building area
- 3,556 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 28, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 43 notices on file; the most recent was issued Sep 18, 2026.
- Construction
Issued Sep 18, 2026 — FAILRE TO CMPLY W/PREV COMMSSNR'S ORDR CNTAIND IN 073126CE30601NB (CONTROL#359025).REMEDY:COMPLY W/ NEW ORDER
- Construction
Issued Aug 4, 2026 — EMERG WRK-OBSERVED ACTIVE EXCAVATION & SOE OF DEEP BRACKET PILES W/ UNDERPIN AT EXP4. OBSERVED DAMAGES, CRACKS, AND SIGNS OF MOVEMENT @ EXP2.OF ADJ. BLDG.POT HAZRD TO SITE,PUBLIC, AND ADJ PROP.REMEDY:COMPLY W/CODE. IMMED RETAIN NYS PE, CS, GC & SSM 2 STAB SITE. SGND&SEALD DOCS. DAILY PE INSPN/RPT. COORD W/ OTHER AGCY
- Construction
Issued Aug 3, 2026 — FAILURE TO COMPLY W/PREV COMMISSIONER'S ORDER.COMPLY W/ NEW ORDER REMEDY:FAILURE TO CMPLY W/ PREV COMMISSIONER'S ORDER CNTAIND IN DOB VIO#073026CE30601YU.COMPLY W/ NEW ORDER
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 28, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01249173-S9.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,037 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01249173-S9
- BBL
- 3009320006
- Postal code
- 11217 · 3582 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 17
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 99








